Current Report
September 26, 2026
Total Progress Photos
106 images
Latest Report
Report 7 of 7
In this report your cab was staged, the frame build continued, the pump house was being transferred, the pedestal was staged, and the body was staged to continue through paint. In the next report your cab and pump house may be staged, the frame build may continue, the pedestal/torque may begin initial assembly, and the body may continue the paint process.
Showing 12 of 30 photos from the latest report.