Terryville NY Report September 26, 2026

Terryville NY Report September 26, 2026

Production Report

September 26, 2026

Job 45190

In this report your cab was staged, the frame build continued, the pump house was being transferred, the pedestal was staged, and the body was staged to continue through paint. In the next report your cab and pump house may be staged, the frame build may continue, the pedestal/torque may begin initial assembly, and the body may continue the paint process.