Production Report
October 24, 2026
Job 45791
In this report the cab completed paint, the frame was staged, the pump house began initial assembly, and the body was staged. In the next report the cab may may be staged to begin initial assembly, the frame build may continue, the pump house may continue initial assembly, and the body may begin initial assembly.