Mastic Beach NY Report September 26, 2026

Mastic Beach NY Report September 26, 2026

Production Report

September 26, 2026

Job 45166

In this report your cab began initial assembly, the frame was staged, the pump house remained staged to begin initial assembly, and the body was staged. In the next report your cab may continue initial assembly, the frame build may continue, the pump house may continue initial assembly, and the body may begin initial assembly.