Mastic Beach NY Report September 19, 2026

Mastic Beach NY Report September 19, 2026

Production Report

September 19, 2026

Job 45166

In this report your cab was staged, the frame build began, the pump house was painted then staged, and the body remained staged. In the next report your cab may begin initial assembly, the frame build may continue, the pump house may continue initial assembly, and the body may remain staged to begin initial assembly.